Zerrullah
Khan Training EVP (Development) South
Karachi
(August 2005 – March 2006)
Managing to execute all development works
in Southern Part (Sindh, Baluchistan) of Pakistan,
including OSP (Coper, OFAN), Radio, Optical
Fiber Links, ISPs (Digital Switch and OLTs
etc.
Managing Director (Telephone Industries of
Pakistan)
(November 2002- August 2005)
On deputation to Telephone Industries of Pakistan
(a joint venture of PTCL and Siemens Germany).
TIP products – Digital Switching (EWSD),
Telephone Instruments, Electrical Energy Meters,
drop wires, PCBs, Containers, DPs, Cabinets,
Guyed Towers, Self Supporting Steel Towers.
Chief Engineer
(Development)
(November 2001 – November 2002)
Member of the team in PTCL HQs. Managing Finances
and Material for Telecom Development Projects,
Monitor / Supervision Development activates
carried out by field units. General
Manager (BT Project)
Monitor / Supervision of turn key BT Projects
for 500,000 lines (ISP / OSP) spread over
the country, carried out by M/S ZTE for PTCL.
Chief Engineer
(Procurement)
Processing / Managing Procurement, for new
Telecom Projects and Materials for Maintenance
of Existing Networks / System. Chief
Engineer (Projects Implements)
(Feb 1997 to December 1998) Same
function as given under CE (Dev) General Manager (WTR)
Quetta
(July 1996 to Feb 1997)
Responsible for maintenance and operation
of Systems / Networks in Western Telecom Region
(Baluchistan) and new development works in
the region. DCE
(M) / GM OFS
(March 1995 to Feb 1996) Assisting Chief Engineer
Maintenance / Operation (CE M&O) HQs.
In overseeing maintenance / operation of System
in the country including arrangement of materials
for maintenance of networks.
Additional chage of GM (OFS): Incharge for
operations and maintenance of the Optical
Fiber Systems / Links in the country. DCE (L) PTCL HQs.
(December 1990 to Feb 1995)
Responsible for managing / procurement of
transmission systems (Radio – high/
medium/low capacity, Optical Fiber Systems)
Satellite Earth Stations / gate ways Managing
Finances for transmission Development Field
Units, Overseeing Development activities in
the field. DE
(M/W) Development Karchi
(January 1985 to September 1990)
Responsible as team leader for planning /
Survey / installation of medium / high capacity
radios system in Sindh and Baluchistan and
Domsats. DE HF
(C) Islamabad.
(June 1982 to December 1985)
Responsible as team leader for planning /
surveys in / installation of small / medium
capacities radios system in Punjab / NWFP.
ADE / DE (Microwave Survey and Designing)
(November 1976 to January 1982)
Responsible as team leader for planning /
survey and design of analogue / digital radios
links (small and high capacity). ADE
(Trainee)
November 1974 to November 1976)
Post Graduate Training in Telecom Staff College
Haripur Hazara. Special
Assignments
Conceived / Surveyed / Planed / Designed
Islamabad, Abbottabad, Gilgit, Hunza, Skardu
M/W links
Coastal M/W links under UNDP funded project
for Telecom links in Northern and Coastal
areas in Pakistan (UNDP) funded project)
Conceived, surveyed, planned, designed as
team leader Peshawar, Quetta, Karachi alternate
M/W links.
Conceived, surveyed, planned, design Peshawar,
Mardan, Swat, Chitral M/W links.
Conceived, surveyed, planned, design and established
Kohat Tall Parachinar small capacity M/W links.
Bannu – Miranshah, Wana Jandola radio
links.
Khuzdar Pangur / Turbat Pasni/ Ormara/ Gwadar/Jewani
small capacity radio links for NWD facilities
of the towns.
Peshawar – Kabul radio links (has been
coordinator from Pakistan for rehabilitation
of Telecom System in Afghanistan from 1992
to 2002.