Zerrullah Khan
Training
EVP (Development) South Karachi
(August 2005 – March 2006)
Managing to execute all development works in Southern Part (Sindh, Baluchistan) of Pakistan, including OSP (Coper, OFAN), Radio, Optical Fiber Links, ISPs (Digital Switch and OLTs etc.
Managing Director (Telephone Industries of Pakistan)
(November 2002- August 2005)
On deputation to Telephone Industries of Pakistan (a joint venture of PTCL and Siemens Germany).
TIP products – Digital Switching (EWSD), Telephone Instruments, Electrical Energy Meters, drop wires, PCBs, Containers, DPs, Cabinets, Guyed Towers, Self Supporting Steel Towers.
Chief Engineer (Development)
(November 2001 – November 2002)
Member of the team in PTCL HQs. Managing Finances and Material for Telecom Development Projects, Monitor / Supervision Development activates carried out by field units.
General Manager (BT Project)
Monitor / Supervision of turn key BT Projects for 500,000 lines (ISP / OSP) spread over the country, carried out by M/S ZTE for PTCL.
Chief Engineer (Procurement)
Processing / Managing Procurement, for new Telecom Projects and Materials for Maintenance of Existing Networks / System.
Chief Engineer (Projects Implements)
(Feb 1997 to December 1998)
Same function as given under CE (Dev)
General Manager (WTR) Quetta
(July 1996 to Feb 1997)
Responsible for maintenance and operation of Systems / Networks in Western Telecom Region (Baluchistan) and new development works in the region.
DCE (M) / GM OFS
(March 1995 to Feb 1996) Assisting Chief Engineer Maintenance / Operation (CE M&O) HQs. In overseeing maintenance / operation of System in the country including arrangement of materials for maintenance of networks.
Additional chage of GM (OFS): Incharge for operations and maintenance of the Optical Fiber Systems / Links in the country.
DCE (L) PTCL HQs.
(December 1990 to Feb 1995)
Responsible for managing / procurement of transmission systems (Radio – high/ medium/low capacity, Optical Fiber Systems) Satellite Earth Stations / gate ways Managing Finances for transmission Development Field Units, Overseeing Development activities in the field.
DE (M/W) Development Karchi
(January 1985 to September 1990)
Responsible as team leader for planning / Survey / installation of medium / high capacity radios system in Sindh and Baluchistan and Domsats.
DE HF (C) Islamabad.
(June 1982 to December 1985)
Responsible as team leader for planning / surveys in / installation of small / medium capacities radios system in Punjab / NWFP.
ADE / DE (Microwave Survey and Designing)
(November 1976 to January 1982)
Responsible as team leader for planning / survey and design of analogue / digital radios links (small and high capacity).
ADE (Trainee)
November 1974 to November 1976)
Post Graduate Training in Telecom Staff College Haripur Hazara.
Special Assignments
Conceived / Surveyed / Planed / Designed
Islamabad, Abbottabad, Gilgit, Hunza, Skardu M/W links
Coastal M/W links under UNDP funded project for Telecom links in Northern and Coastal areas in Pakistan (UNDP) funded project)
Conceived, surveyed, planned, designed as team leader Peshawar, Quetta, Karachi alternate M/W links.
Conceived, surveyed, planned, design Peshawar, Mardan, Swat, Chitral M/W links.
Conceived, surveyed, planned, design and established Kohat Tall Parachinar small capacity M/W links.
Bannu – Miranshah, Wana Jandola radio links.
Khuzdar Pangur / Turbat Pasni/ Ormara/ Gwadar/Jewani small capacity radio links for NWD facilities of the towns.
Peshawar – Kabul radio links (has been coordinator from Pakistan for rehabilitation of Telecom System in Afghanistan from 1992 to 2002.


 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
 
 